New machinery arrives at VIP

Monday 21 March 2016, 11:37 am

VIP today took delivery of two new “C Frame” LWB Steinl presses which will increase gasket jointing capacity and also facilitate the production of angled joints that are increasingly
needed on segment gaskets. 

Share this articleTweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Facebook
Facebook

Recent VIP News:

No-Dig Roadshow

VIP to exhibit at the No-Dig Roadshow

VIP will be exhibiting at 2 events on the 2019 No-Dig Roadshow. The events, aime
Learn more

Hydro Electric Power Station

VIP-Weco has power to seal hydro-electricity pipe

A hydro-electric water pipe that carries water from a river to a power generator has been sealed at multiple points using the no-dig VIP-Weco pipe rehabilitation system.

Read the full story

View Case studyCase study